Yocto Project Status 3 February 2026 (WW06)

Current Dev Position: YP 6.0 M2
Next Deadline: YP 6.0 M2 Build Date 2026-02-16

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3.1 is due to be released
  • YP 6.0 M1 is in QA
  • YP 4.0.33 is queued for QA after 6.0 M1
  • YP 6.0 M2 is now targeting a build date of 16th Feb. This will give us three weeks each for M3 (target date 9th March) and M4 (target build date 30th March).
  • Good progress has been made with the autobuilder issues but we still don’t have the stability in builds we need for reliable project operations.
  • There are currently 5 high open bugs, which will block M2. Three have line of sight to being resolved (Thanks Alex and Michael!):
    • Issues reusing binaries from fedora 42/43 on older systems (#16087)
    • Hangs of the autobuilder controller (database locking?) (#16129)
    • Generation of releases.json needs updating (#16138)
  • Two are currently needing further work:
    • rust do_test_compile/do_install segfault (#16058)
    • x86 kvm broken on Fedora 43 (#16074)
  • “build-sysroots: useradd command did not succeed” (#16135) was fixed, thanks Adrian!
  • The number of intermittent failures affecting builds, both stable and development, continues to be problematic. Any given build is now statistically likely to hit one or more of them and we often don’t have successful builds. Since we struggle to get help in addressing these, we need to change and start potentially blocking releases (including stable/LTS) until these get addressed in some way. We are holding some dedicated meetings to triage these and find ways of removing the failures from our builds which may include reducing testing.
  • Patches are merging again but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.

Ways to contribute:

New to the project?

Tracking Metrics:

YP 6.0 Milestone Dates:

  • YP 6.0 M2 Build Date 2026-02-16
  • YP 6.0 M2 Release Date 2026-02-27
  • YP 6.0 M3 Build Date 2026-03-09
  • YP 6.0 M3 Release Date 2026-03-20
  • YP 6.0 M4 Build Date 2026-03-30
  • YP 6.0 M4 Release Date 2026-04-26

Upcoming dot releases:

  • YP 5.3.1 is under review.
  • YP 4.0.33 is queued for QA after 6.0 M1.
  • YP 5.0.16 Build Date 2026-02-09
  • YP 5.0.16 Release Date 2026-02-20
  • YP 5.3.2 Build Date 2026-02-16
  • YP 5.3.2 Release Date 2026-02-27
  • YP 4.0.34 Build Date 2026-02-23
  • YP 4.0.34 Release Date 2026-03-06
  • YP 5.3.3 Build Date 2026-03-09
  • YP 5.3.3 Release Date 2026-03-20
  • YP 5.0.17 Build Date 2026-03-16
  • YP 5.0.17 Release Date 2026-03-23
  • YP 4.0.35 Build Date 2026-04-06
  • YP 4.0.35 Release Date 2026-04-17
  • YP 5.3.4 Build Date 2026-04-13
  • YP 5.3.4 Release Date 2026-04-24
  • YP 5.0.18 Build Date 2026-04-20
  • YP 5.0.18 Release Date 2026-05-01
  • YP 5.0.19 Build Date 2026-05-26
  • YP 5.0.19 Release Date 2026-06-05